Skip to main content
Back to time machine

Morph

Tracked across 12 snapshots (2026-04-092026-06-12).

Latest rating
51
Rating delta
+4
Latest signal
Tracked
Tracked
Caps now applied
0

Rating timeline

02550751002026-04-09 — rating 47, Tracked2026-04-10 — rating 47, Tracked2026-04-20 — rating 47, Tracked2026-04-21 — rating 47, Tracked2026-04-30 — rating 47, Tracked2026-05-04 — rating 39, Tracked2026-05-05 — rating 47, Tracked2026-05-16 — rating 48, Tracked2026-05-18 — rating 47, Tracked2026-05-28 — rating 51, Tracked2026-06-10 — rating 51, Tracked2026-06-12 — rating 51, Tracked2026-04-092026-05-052026-06-12

Dimension trajectory

Autonomy

9/20
2002026-04-09 — 8/202026-04-10 — 8/202026-04-20 — 8/202026-04-21 — 8/202026-04-30 — 8/202026-05-04 — 8/202026-05-05 — 8/202026-05-16 — 8/202026-05-18 — 8/202026-05-28 — 9/202026-06-10 — 9/202026-06-12 — 9/20

Integration

8/20
2002026-04-09 — 5/202026-04-10 — 5/202026-04-20 — 6/202026-04-21 — 6/202026-04-30 — 6/202026-05-04 — 5/202026-05-05 — 5/202026-05-16 — 5/202026-05-18 — 5/202026-05-28 — 8/202026-06-10 — 8/202026-06-12 — 8/20

Context

14/20
2002026-04-09 — 12/202026-04-10 — 12/202026-04-20 — 12/202026-04-21 — 12/202026-04-30 — 12/202026-05-04 — 12/202026-05-05 — 12/202026-05-16 — 13/202026-05-18 — 13/202026-05-28 — 13/202026-06-10 — 14/202026-06-12 — 14/20

Compliance

11/20
2002026-04-09 — 9/202026-04-10 — 9/202026-04-20 — 7/202026-04-21 — 7/202026-04-30 — 7/202026-05-04 — 9/202026-05-05 — 9/202026-05-16 — 10/202026-05-18 — 10/202026-05-28 — 11/202026-06-10 — 11/202026-06-12 — 11/20

Viability

7/20
2002026-04-20 — 10/202026-04-21 — 10/202026-04-30 — 10/202026-05-04 — 0/202026-05-16 — 8/202026-05-18 — 7/202026-05-28 — 7/202026-06-10 — 7/202026-06-12 — 7/20

Interface

12/20
2002026-04-09 — 13/202026-04-10 — 13/202026-04-20 — 13/202026-04-21 — 13/202026-04-30 — 13/202026-05-04 — 13/202026-05-05 — 13/202026-05-16 — 13/202026-05-18 — 13/202026-05-28 — 13/202026-06-10 — 12/202026-06-12 — 12/20

Cap timeline

no-git-integrationno-git-integration: 2026-04-09 → 2026-04-10no-git-integration: 2026-05-04 → 2026-05-05unvalidated-benchmarksunvalidated-benchmarks: 2026-04-09 → 2026-04-10unvalidated-benchmarks: 2026-05-04 → 2026-05-05

Notable events

  • 2026-04-20Cap −no-git-integration
  • 2026-04-20Cap −unvalidated-benchmarks
  • 2026-05-04Cap +no-git-integration
  • 2026-05-04Cap +unvalidated-benchmarks
  • 2026-05-04Drop-8 rating
  • 2026-05-05Jump+8 rating
  • 2026-05-16Cap −no-git-integration
  • 2026-05-16Cap −unvalidated-benchmarks

What would move this next

Upgrade if: Series A announced (resolves the viability/structural-risk timer), independent third-party Fast Apply benchmark showing sustained differentiation against frontier-model native edits, named Validated-tier enterprise reference beyond Binance, Glance/WarpGrep adoption proof points (stars, third-party CI usage) materialize, or team scales beyond 5 engineers. Downgrade if: stalled-development cap triggers (no npm/GitHub activity 90+ days — currently active, last commit 2026-05-28), genuine funding/runway distress for THIS Morph, founder departure (verified for this company, not the crypto namesake), Cursor or Claude Code drop MCP integration, or frontier-model native structured-edit/agentic-search capability demonstrably overtakes Fast Apply/WarpGrep on independent benchmarks.

Morph — history | Agentic Developer Tools Radar · Signal